Product Detail :
|
Supplying of quarry dust ~ for monsoon reserve 2019-20 at dgd, kth, cpu & dhn. * Reconditioning of tongue rails of points & crossing, womout sej's by use of electrodes and resurfacing of wheel burntscabbed rails and cupped welds ~ on rails using micro flow thermal spray technology as approved by rdso/lko's approved in the jurisdiction of den land ecr/dhn. * Ballasting of track ~ including 300mm deep screening in main line tumout (1 in 128 1 in 8.5) in pradhankhanta-manpur section total=18 km. (24 sets) under sr. divl. engineer(2nec. * De-silting of upper chowrapatti reservoirs ~ for increasing of storage capacity to facilitate uninterrupted drinking water supply at gmo colonies and service buildings. * Reconditioning of tongue rail, points & crossing, worn out sej and resurfacing of wheelbumtrails ~ in gc section under sr. divl. engineer (2nec rly. * Changing corroded/rusted/cracked of top flange plate, bottom main angle, gusset plate, lateral bracing strengthening of cross girder, provision of protection screen and changing of loose rivets of bridge ~ no. 7, 31, 35 & 44 in cpu-sktn section under sse/br/dto in dhn. * Regarding of bridge ~ no.416 (up & dn line), span (1x9.15 + 1x12 2 + 1x9.15) between bnf-tkn station at km.455/28-456/1 under sse[bridge)dhanbad in dhn. * Supply of portion and labour ~ for welding of 60kg./52kg. rail by skv process (single shot) under divl. engineer(3ve.c. rly. * Supply of drinking water ~ through private water tanker at dhn, kth & peh railway colony for 01 year under sr. asstt. engineer(1), e.c.rly, dhanbad & asstt.
|